Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days |
Packaging Details | Iron Frame Package |
Pressure | High Pressure |
Structure | Fire / Water Tube |
Fuel | Coal / Gas / Coal-fired / Water heat |
Product Name | Boiler Water Walls |
Range of Applications | Industrial / Power Station |
NDE | 100% PT,100 RT,100% UT |
Brand Name | HD BOILER |
Model Number | Furnace wall |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | Zhangjiagang,China |
View Detail Information
Explore similar products
Alloy Customized Heat Recovery Steam Generator For Power Plant With ASME
EN3834 SA210 A1 Membrane Boiler Water Wall Panels For Power Station long life
TUV Certificated Carbon Steel Boiler Membrane Wall Tubes High Efficiency
SA -210 High Performance Water Wall Panels Efficient Heat Exchange Boiler Part
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days | Packaging Details | Iron Frame Package |
Pressure | High Pressure | Structure | Fire / Water Tube |
Fuel | Coal / Gas / Coal-fired / Water heat | Product Name | Boiler Water Walls |
Range of Applications | Industrial / Power Station | NDE | 100% PT,100 RT,100% UT |
Brand Name | HD BOILER | Model Number | Furnace wall |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | Zhangjiagang,China |
High Light | Boiler Heating Surface Membrane Wall ,Argon Arc Welding Boiler Membrane Wall ,Argon Arc Welding Membrane Water Wall |
High Pressure Power Boiler Heating Surface Membrane Wall Argon Arc Welding
Membrane Water Wall Description
The heating surface arranged on the inner wall of the furnace is mainly cooled by water, which is called the water wall. It is the main evaporation heating surface of power station boiler. The main functions of the water wall are :
(1) absorbing the radiant heat in the furnace, heating the water into saturated steam;
(2) protect the furnace wall, simplify the structure of the furnace wall, reduce the weight of the furnace wall, which is mainly due to the absorption of radiant heat in the furnace wall water wall, so that the temperature of the furnace wall is reduced;
(3) the absorption of heat in the furnace, the flue gas cooled to the temperature allowed by the furnace exit, which is beneficial to reduce the slagging in the furnace and prevent the slagging in the furnace exit;
(4) The water wall absorbs radiant heat at high temperature in the furnace and has good heat transfer effect, so it can reduce the boiler steel consumption and boiler cost.
Advantages
1.ensure sealing of furnace wall and reduce air leakage in combustion chamber.
2.realize full water cooling of the combustion chamber, which is helpful to prevent coke formation in the case of intensified combustion.
3.small capacity of heat storage, fast heating of combustion chamber and rapid cooling, can shorten the cooling time of boiler start and stop.
4.it is appropriate to use pipe furnace wall, which greatly reduces the load of boiler frame and is convenient for suspension.
5.compared with the optical tube, the heat absorption capacity of the tube is improved.
6.the pre-combination degree of boiler components is improved, which is convenient and reduces the installation workload.
Specification of Membrane Water Wall
Name | Membrane water panel |
Material | Carbon steel,Alloy,Stainless steel |
Tube size | Φ38 - 76 mm, Customize |
Standard | ISO , ASME |
Model | Studded |
Application | Istallable around the boiler combustion chamber |
Waterwall Panel Workshop
Note
1 | Control of weld penetration to satisfy mechanical and heat transfer requirements Control of the deformation to acceptable tolerances. |
2 | Panels routinely require straightening in the workshop after welding and heat treatment, the question to be answered is can the shop then meet the required dimensional tolerances for successful site installation? |
3 | Can existing shop handling procedures be used as-is without adding excessive controls that will add cost and schedule. |
4 | The importance of preheating and its maintenance through the welding process could cause a number of handling and shop processing issues that will substantially increase cost. |
Quality Control
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 400 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us