Payment Terms | L/C, T/T, Western Union |
Supply Ability | 800 Tons / Month |
Delivery Time | 60 Days |
Packaging Details | Steel Frame |
Material of Tube | SA106 Gr. B and SA192M |
Product Name | Rear Wall & Evaporator |
Standard | ASME |
Application | Sugar Mill and Power Plant Boilers |
Keyword | Evaporator Coil and Membrane Wall |
Material of Fin | Q235B |
Brand Name | HD BOILER |
Model Number | Rear Wall Evaporator |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | Zhangjiagang,China |
View Detail Information
Explore similar products
Alloy Customized Heat Recovery Steam Generator For Power Plant With ASME
EN3834 SA210 A1 Membrane Boiler Water Wall Panels For Power Station long life
TUV Certificated Carbon Steel Boiler Membrane Wall Tubes High Efficiency
SA -210 High Performance Water Wall Panels Efficient Heat Exchange Boiler Part
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 800 Tons / Month |
Delivery Time | 60 Days | Packaging Details | Steel Frame |
Material of Tube | SA106 Gr. B and SA192M | Product Name | Rear Wall & Evaporator |
Standard | ASME | Application | Sugar Mill and Power Plant Boilers |
Keyword | Evaporator Coil and Membrane Wall | Material of Fin | Q235B |
Brand Name | HD BOILER | Model Number | Rear Wall Evaporator |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | Zhangjiagang,China |
High Light | ASME Standard boiler evaporator coils ,ASME Standard Evaporator Coils Assembly ,8.1Mpa boiler evaporator coils |
8.1Mpa ASME Standard Evaporator Coils Assembly with Boiler Membrane Wall
Introduction
Evaporative tube bundle is an evaporative tube bundle mainly absorbing convection heat transfer in small and medium capacity boiler. It is generally a bundle of dense staggered tube system composed of ascending and descending tubes connected with upper and lower drum.Evaporation tube bundle pipe heat load is high, this part of the pipe by hot water into steam, from the bottom up;Its main function is to absorb heat to the water and steam and to serve as the rising part of the boiler water cycle.
Water wall panels are the main heating surface of boilers, composed of numbers of rows of steel tubes, arranged around the boiler corner. Inside is the flowing water or steam, and the outside accepts the heat of the flame in the furnace of the boiler, mainly absorbing the radiation heat of the high temperature combustion products in the furnace. The working fluid rises in it and evaporates by heat.
If according to the structure type, there are three main types: bare tube type, membrane type and prick tube type.
Membrane water wall is an air-tight structure consisting of pipes and fins.The advantages are less air leakage in furnace; can use pipe-laying wall, less load on steel structure and lower cost of boiler; easy to use suspension structure and improve thermal expansion system, suitable for large-scale mechanized production, high assembly rate, low heat storage capacity and shorten star-up and shutdown time. The disadvantage is that the manufacturing process is complex. Membrane water wall is often used in large capacity, high temperature and high pressure boilers.
According to the different manufacturing process, the membrane water wall can be divided into three types(see Fig. 1):1.rolled fin tubes are welded in rows, with less welding workload, but the fin tubes are expensive. 2.bare tube and fin(flat steel) are welded in rows, which has low material cost and can easily meet the requirements of various pitches, but flat steel requires high precision and finishing equipment.3.Bare tube fusion welding,the fins between tubes are formed by filling the welding wire, mostly used for the small pitch between the tubes. The pitch between tubes of membrane water wall is related to factors such as boiler pressure and furnace heat load, usually s/d is 1.2-1.5.
Membrane walls are widely used as heating surfaces for power plant boilers and industrial boilers.
Strong points of membrane water wall
(1) Ensure the sealing of furnace wall and reduce air leakage in combustion chamber.
(2)The realization of full water cooling in combustion chamber is beneficial to prevent coking under the condition of intensified combustion.
(3)The cooling time of start-up and shutdown of boilers can be shortened because of its small heat storage capacity, fast temperature rise and fast cooling in combustion chamber.
(4)Pipe-laying furnace wall is suitable, which greatly reduces the load of boiler frame and it is convenient for suspension and lifting.
(5)Compared with the bare tube type, the heat absorption capacity of the tube is improved.
(6)It improves the per-assembly degree of boiler components, facilitates and reduces the installation workload
The drawing here is the evaporator assembly with membrane wall and evaporator coils for your reference.
This project also include steam drum+header+economizer.
DESIGN AND FABRICATION CODE | ASME SECTION I, 2019 EDITION |
DESIGN PRESSURE | 8.1 MPa |
MAX. ALLOWABLE WORKING PRESSURE | 8.1 MPa |
DESIGN TEMPERATURE | 320℃ |
HYDROSTATIC TEST PRESSURE | 12.2 MPa |
CORROSION ALLOWANCE | 0.5mm |
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!