Payment Terms | L/C, T/T |
Supply Ability | 800 Tons / Month |
Delivery Time | 45 Days |
Packaging Details | Seaworthy packing |
Type | Boiler Tube, Straight and Bend |
Fuel | Coal-fired |
Pressure | High Pressure |
Dimension(L*W*H) | Depends |
Situation | New |
Color | Red |
Brand Name | Dehai Boiler |
Model Number | Reheater |
Certification | ISO9001 , SGS , ABS , ASME |
Place of Origin | China |
View Detail Information
Explore similar products
Shell Protection Reheater In Boiler ASME Standard Proper Drainage
Seamless Steam Reheater , Water Reheater Gas Fired Boiler Pipes High Pressure
Turbine Protect Water Reheater , Superheater Tubes Avoid Excess Moisture
Steam Cycle Piping Reheater In Boiler Customized Dimension Stainless Steel
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 800 Tons / Month |
Delivery Time | 45 Days | Packaging Details | Seaworthy packing |
Type | Boiler Tube, Straight and Bend | Fuel | Coal-fired |
Pressure | High Pressure | Dimension(L*W*H) | Depends |
Situation | New | Color | Red |
Brand Name | Dehai Boiler | Model Number | Reheater |
Certification | ISO9001 , SGS , ABS , ASME | Place of Origin | China |
High Light | reheater in power plant ,water reheater |
ISO 9001 Certification industrial super heater and re heater for power station reheat cycle
Industrial reheater Introduction
1. A reheater has derived its name from reheating the steam at a stage after expansion to a certain pressure (Not till the condenser pressure). The main objective of the reheater is to increase the dryness fraction (moisture content of the steam at the last blade of turbine).
2. But due to this an additional work also is extracted from the turbine due to two stage expansion. So, work output increases. But also the steam uses extra heat to raise its pressure in the second stage after first expansion.
3. So, increase or decrease in efficiency is dependent on which of the above is more.
4. Concluding, it is used to increase the dryness fraction and also to increase work output when you have high amount of heat input.
Reheater Function
1. Therefore the number of reheat stages can not be many as the pressure drop will reduce efficiency of thermal cycle.The steam pipes and reheater coils are to be so designed to limit the drop to 2–3%.
2. The control valves in reheat steam path is not desirable.Systems using HP LP bypass require these valves to control steam flow during bypass operation.
3. The efficiency of the Reheat cycle can be improved by increasing the pressure and temperature of steam entering into the turbine. As the initial pressure increases the expansion ratio of the turbine also increases and the steam becomes quite wet at the end of expansion.
Main Advantage
The main advantage of reheat cycle is to reduce the specific consumption and consequently reduce the size of the boiler and other auxilaries for the same power.The reheat cycle is preffered for the high capacity above 100 MW plant.
Differences
Type | Advantages | Disadvantages | Supporting method |
Pendant-type | 1.Firm structural support | 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. | supported from above |
Inverted-type | 1.Proper drainage of the condensed steam | 1. Lack the structural rigidity, especially in high speed gas flow | Supported from below |
Horizontal -type | 1. Proper drainage 2. Good structural rigidity. | 1. They do not view the flam directly so they are mainly from the convective type | Usually supported in the vertical gas ducts parallel to the main furnace. |
Ball through
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1998
Total Annual:
30,000,000.00-50,000,000.00
Employee Number:
300~500
Ecer Certification:
Active Member
Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is... Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is...
Get in touch with us
Leave a Message, we will call you back quickly!