Payment Terms | L/C, T/T |
Supply Ability | 800 Tons / Month |
Delivery Time | 45 Days |
Packaging Details | Seaworthy packing |
Application | Economizer Tube |
Type | Boiler Tube, Straight and Bend |
Usage | Boiler tube / Reheater tube / Superheater tube |
Pressure | High Pressure |
Weight | 5~50ton |
Situation | New |
Brand Name | Dehai Boiler |
Model Number | Reheater |
Certification | ISO9001 , SGS , ABS , ASME |
Place of Origin | China |
View Detail Information
Explore similar products
Seamless Steam Reheater , Water Reheater Gas Fired Boiler Pipes High Pressure
Industrial Reheater In Boiler Control Valves Equipped Reduce Consumption
Turbine Protect Water Reheater , Superheater Tubes Avoid Excess Moisture
Steam Cycle Piping Reheater In Boiler Customized Dimension Stainless Steel
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 800 Tons / Month |
Delivery Time | 45 Days | Packaging Details | Seaworthy packing |
Application | Economizer Tube | Type | Boiler Tube, Straight and Bend |
Usage | Boiler tube / Reheater tube / Superheater tube | Pressure | High Pressure |
Weight | 5~50ton | Situation | New |
Brand Name | Dehai Boiler | Model Number | Reheater |
Certification | ISO9001 , SGS , ABS , ASME | Place of Origin | China |
High Light | reheater in power plant ,steam reheater |
Shell Protection erosion shield for the boiler tube and reheater tube ASME standard
Boiler tube and reheater Introduction
1. High pressure steam is expanded in turbine,moisture content of exhaust steam increases, which creates problem at exit end blades. So reheat type turbine is most commonly used for large capacity turbine using high pressure steam.
2. Steam after expanding at HP Turbine is sent to boiler for further heat addition or reheat.This steam is called as Cold reheat.Cold reheat is heated at reheater of the boiler.
3. The reheat steam called as Hot reheat is then sent to IP/ LP Turbine where it expands further. Single and double reheat turbines are commonly used for power generation.
Reheater Function
1. Therefore the number of reheat stages can not be many as the pressure drop will reduce efficiency of thermal cycle.The steam pipes and reheater coils are to be so designed to limit the drop to 2–3%.
2. The control valves in reheat steam path is not desirable.Systems using HP LP bypass require these valves to control steam flow during bypass operation.
3. The efficiency of the Reheat cycle can be improved by increasing the pressure and temperature of steam entering into the turbine. As the initial pressure increases the expansion ratio of the turbine also increases and the steam becomes quite wet at the end of expansion.
Main Advantage
The main advantage of reheat cycle is to reduce the specific consumption and consequently reduce the size of the boiler and other auxilaries for the same power.The reheat cycle is preffered for the high capacity above 100 MW plant.
Differences
Type | Advantages | Disadvantages | Supporting method |
Pendant-type | 1.Firm structural support | 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. | supported from above |
Inverted-type | 1.Proper drainage of the condensed steam | 1. Lack the structural rigidity, especially in high speed gas flow | Supported from below |
Horizontal -type | 1. Proper drainage 2. Good structural rigidity. | 1. They do not view the flam directly so they are mainly from the convective type | Usually supported in the vertical gas ducts parallel to the main furnace. |
Detailed Picture
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1998
Total Annual:
30,000,000.00-50,000,000.00
Employee Number:
300~500
Ecer Certification:
Active Member
Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is... Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is...
Get in touch with us
Leave a Message, we will call you back quickly!