Payment Terms | L/C, T/T |
Supply Ability | 800 Tons / Month |
Delivery Time | 45 Days |
Packaging Details | Seaworthy packing |
Type | Energy Saving |
Technique | Pipe Bending |
Output | Steam |
HS Code | 8402900000 |
Warranty | 1 Year |
Material | Carbon Steel / Alloy Steel |
Brand Name | Dehai Boiler |
Model Number | Reheater |
Certification | ISO9001 , SGS , ABS , ASME |
Place of Origin | China |
View Detail Information
Explore similar products
Shell Protection Reheater In Boiler ASME Standard Proper Drainage
Seamless Steam Reheater , Water Reheater Gas Fired Boiler Pipes High Pressure
Industrial Reheater In Boiler Control Valves Equipped Reduce Consumption
Turbine Protect Water Reheater , Superheater Tubes Avoid Excess Moisture
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 800 Tons / Month |
Delivery Time | 45 Days | Packaging Details | Seaworthy packing |
Type | Energy Saving | Technique | Pipe Bending |
Output | Steam | HS Code | 8402900000 |
Warranty | 1 Year | Material | Carbon Steel / Alloy Steel |
Brand Name | Dehai Boiler | Model Number | Reheater |
Certification | ISO9001 , SGS , ABS , ASME | Place of Origin | China |
High Light | reheater in power plant ,steam reheater |
Heat Resistance Seamless Steel Tube Super heater Reheater Price waste heat boiler
Resistance Seamless Steel Reheater General
1. The boiler is furnished with reheaters, where the steam is reheated to improve cycle efficiency after high pressure part of the steam turbine. Reheater system increase boiler LP – steam, which is turbine’s IP-steam (IP = IntermediatePressure), temperature after turbine HPcasing.
2. After reheater steam is lead to turbine IP-casing. Steam from the pressure reduction valve after superheater IV is taken to the inlet of the reheater I. The valves are arranged so that the pressure reduction station (S1 LBH10/20 AA201) controls boiler HP –steam pressure, but functioning also as a safety valves of the HP –steam system (in the cold reheater line).
Hot Reheat System
1. Hot reheat steam system has two safety valves, which functions also as pressure controlling device’s. Hot reheat system valves blow first and therefore in some operation situations HP –pressure station valves can be maintain closed.
2. These valves are used for regulating the boiler pressure especially during start ups (or shut down). The start-up steam line is led to atmosphere trough a silencer. The reheat steam enters to reheater IA, which is of similar construction to superheater I and located in the back pass of the boiler after SH II. Reheater IB is after SH I.
3. Reheat steam temperature is maintained at design value typically over load range 60 –100 % of MCR. Compared with feed water spray control by-pass control gives higher plant efficiency. Final reheating takes place in reheater II, which is similar in construction to Intrex superheaters and is located in the return leg. All superheaters and reheaters are fully drainable.
Differences
Type | Advantages | Disadvantages | Supporting method |
Pendant-type | 1.Firm structural support | 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. | supported from above |
Inverted-type | 1.Proper drainage of the condensed steam | 1. Lack the structural rigidity, especially in high speed gas flow | Supported from below |
Horizontal -type | 1. Proper drainage 2. Good structural rigidity. | 1. They do not view the flam directly so they are mainly from the convective type | Usually supported in the vertical gas ducts parallel to the main furnace. |
100% RT Test
Squeezing
After Squeezing
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1998
Total Annual:
30,000,000.00-50,000,000.00
Employee Number:
300~500
Ecer Certification:
Active Member
Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is... Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is...
Get in touch with us
Leave a Message, we will call you back quickly!