China factories

China factory - Zhangjiagang Dehai Boiler Co., Ltd

Zhangjiagang Dehai Boiler Co., Ltd

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Medium Size Boiler Manifold Headers 300psi-2000psi With Pressure Vessel
China Medium Size Boiler Manifold Headers 300psi-2000psi With Pressure Vessel

  1. China Medium Size Boiler Manifold Headers 300psi-2000psi With Pressure Vessel
  2. China Medium Size Boiler Manifold Headers 300psi-2000psi With Pressure Vessel
  3. China Medium Size Boiler Manifold Headers 300psi-2000psi With Pressure Vessel

Medium Size Boiler Manifold Headers 300psi-2000psi With Pressure Vessel

  1. MOQ: 5 Tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 500 Tons / Month
Delivery Time 50 Days
Packaging Details Seaworthy packing
Structure Water Tube
Style CFB Boiler
Warranty 1 Year
Color Customer's Requirement
Brand Name Dehai Boiler
Model Number Boiler Header
Certification ISO9001/SGS/TUV/ASME/EN
Place of Origin Jiangsu, China (Mainland)

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 500 Tons / Month
Delivery Time 50 Days Packaging Details Seaworthy packing
Structure Water Tube Style CFB Boiler
Warranty 1 Year Color Customer's Requirement
Brand Name Dehai Boiler Model Number Boiler Header
Certification ISO9001/SGS/TUV/ASME/EN Place of Origin Jiangsu, China (Mainland)
High Light low loss headercopper manifold
Boiler Medium Header For Steam Boiler Buy Boiler Header Boiler Pressure vessel

 

Boiler Medium Header Features

 

1. Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi.

2. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers
3. Bevelling and weld preparation of stubs duly tack-welded to the main body of the header are first shown to Chief Inspector of Boilers for his approval and once again the stubs fully welded with main body are shown to Chief Inspector of Boilers under hydraulic pressure, varying from 1000 to 3000 psi as required by the specifications.
4. The headers are stamped by Chief Inspector of Boilers before they leave our manufacturing plant. We also weld skubolets and weldolets in place of stubs.

 

Introduction

 

1. The pressures and temperatures that headers have to withstand depend on the component to which they are connected.

2. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.

3. The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
4. Technical parameters of customer design boiler pressure parts header for CFB boiler.

 

Specification

 

Diameter(OD) ¢76mm~¢914mm
Length(Max) 23000mm
Temperature(℃) 300~1500

 

Product Name
Membrane Water Wall Header for boiler
Applied Area
boiler membrane water wall
Body Material
- Carbon Steel : 20#, 20G, A192, A-1
- Alloy Steel : 15CrMoG, 12Cr1MoVG, T11, T22
Nozzle Tube Material
As per design
Standard
China GB, ASME
Manufacturer Grade
China A Grade, ABS Certificated, TUV Certificated
Working Temperature
depends on material
Working Pressure
1.6 MPa ~ 15 MPa
Body Thickness
As per design
Body Diameter
As per design
Body Length
As per design
Welding
SMAW, SAW, GTAW (TIG)
Welding NDT
- Body : 100% RT or 100% UT
- Nozzle tube > Φ108 : > 20% MT, 100% UT
- Nozzle tube <= Φ108 : > 20% MT

 

Beveling

 

 

Polishing

 

 

100% Liquid Penetrant Test

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    1998

  • Total Annual:

    30,000,000.00-50,000,000.00

  • Employee Number:

    300~500

  • Ecer Certification:

    Active Member

    Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is...     Dehai Boiler is a manufacturer of A-class boiler(Power station boiler,industrial boiler,HRSG,waste-to-energy boiler,biomass boiler) and correlated A-class pressure parts intergrating the design,fabrication,installation,repair and mainteance. Dehai has ISO9001:2008 certificate is...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang Dehai Boiler Co., Ltd
  • No.1, Huangqi Road, Li village
  • https://www.boiler-unit.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement