Supply Ability | 5 SETS per month |
Delivery Time | 15 days |
Packaging Details | wood packet |
Capacity | 2t |
Working Pressure | 1.25MPa |
Structure | Fire Tube |
Efficiency | 82% |
Weight | 13.6t |
Warrary | 2 years |
Usage | Industrial, Power Station, for hospital |
Fuel | Biomass |
Brand Name | Yuji |
Model Number | Biomass Steam Boiler |
Certification | ISO CE |
Place of Origin | China (Mainland) |
View Detail Information
Explore similar products
Industrial Biomass Steam Boiler , Waste Wood Boiler Single Cylinder Waterproof
4 Ton Capacity Biomass Steam Boiler DZL Series Cost Effctive High Ssafety
4 Ton Capacity Biomass Steam Boiler DZL Series Cost Effctive High Ssafety
High Temperature Biomass Heating Systems Stainless Steel Heater With PLC Control
Product Specification
Supply Ability | 5 SETS per month | Delivery Time | 15 days |
Packaging Details | wood packet | Capacity | 2t |
Working Pressure | 1.25MPa | Structure | Fire Tube |
Efficiency | 82% | Weight | 13.6t |
Warrary | 2 years | Usage | Industrial, Power Station, for hospital |
Fuel | Biomass | Brand Name | Yuji |
Model Number | Biomass Steam Boiler | Certification | ISO CE |
Place of Origin | China (Mainland) | ||
High Light | industrial biomass boiler ,biomass log boiler |
Product Features
1. Things are easy to install:
Waller is usually out of warehouse quickly, easy to install in transportation and site, greatly shorten the construction machine, save installation costs, so as to produce boilers in time.
2. Executable:
When the boiler is opened, the configuration is reasonable, the water circulation is smooth, the cooling is guaranteed when the boiler is opened, and the safety of the boiler is guaranteed.
3. Easy to manage:
Boiler steam pack can be installed and repaired with acceptance holes. The smoke box in front of the boiler is easy to open, and the personnel are convenient and clear, providing good conditions.
4. Complete combustion:
The second air and reasonable heating furnace design, full combustion of fuel, removal of black smoke.
5. Efficient Arrangement:
Boiler arrangement and biofuel suit to avoid air leakage and oil leakage. Compared with the general arrangement of heating stoves, the operation is convenient and has obvious advantages.
Technical Parameters
Main Technical Parameters of DZH Series Biomass Steam Boiler
Item | Unit | DZH1 | DZH2 | DZH3 | DZH4 | DZH6 | DZH8 | DZH10 |
Steam Capacity | t/h | 1 | 2 | 3 | 4 | 6 | 8 | 10 |
Working Pressure | MPa | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 |
Steam Temperature | ℃ | 193/204 | 193/204 | 193/204 | 193/204 | 193/204 | 193/204 | 193/204 |
Feed Water Temperature | ℃ | 20 | 20 | 20 | 20 | 20 | 20 | 60 |
Thermal Efficiency | / | ≥82 | ||||||
Fuel | / | Biomass particles | ||||||
Fuel Consumption | Kg/h | 176.6 | 352.3 | 522.5 | 697 | 1044 | 1396 | 1744 |
Heating area | m2 | 39.82 | 82 | 120.2 | 174.32 | 239 | 317 | 409 |
Grate area | m2 | 1.97 | 2.7 | 4.1 | 5.43 | 6.7 | 10.2 | 13.6 |
Power consumption | Kw | 13.7 | 18 | 31.5 | 31.5 | 45 | 69.2 | 95.5 |
water volume | m3 | 4.5 | 4.68 | 5.9 | 6.3 | 11 | 13.8 | 16.5 |
Note: The fuel consumption in the table is calculated on the basis of the low calorific value of biomass particles 17084KJ/Kg (4085Kcal/Kg). If the low calorific value of biomass fuel is larger than that, the corresponding fuel consumption will be more economical than that in the table.
Shape and Interface Dimensions of DZH Series Hand-fired Biomass Steam Boilers
Type Item | DZH1 | DZH2 | DZH3 | DZH4 | DZH6 | DZH8 | DZH10 | ||
Rated Steam Capacity | t/h | 1 | 2 | 3 | 4 | 6 | 8 | 10 | |
Host Transport Dimension | L | mm | 4300 | 5140 | 5630 | 5920 | 6200 | 6800 | 7500 |
W | mm | 1900 | 2500 | 2700 | 2700 | 2960 | 3400 | 3400 | |
H | mm | 2900 | 3100 | 3300 | 3430 | 3580 | 3600 | 3700 | |
Host Transport Weight | / | t | 13.6 | 18 | 23 | 25.3 | 31 | 34 | 39 |
Main Steam Valve Pipe Diameter | DN | mm | 65 | 80 | 100 | 100 | 125 | 150 | 150 |
Feed Water Valve | DN | mm | 40 | 40 | 40 | 40 | 50 | 50 | 50 |
Safety Valve Diameter | DN | mm | 2×40 | 2×50 | 2×50 | 2×50 | 50/80 | 2×80 | 2×80 |
Drain Valve Pipe Diameter | DN | mm | 3×40 | 3×40 | 3×40 | 3×40 | 3×40 | 3×40 | 3×40 |
Chimney Diameter | φ | mm | 280 | 350 | 410 | 410 | 530 | 720 | 750 |
Remarks: We will reserve rights to change the above mentioned data due to continuous policy transformation and product improvement.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2005
Total Annual:
7100000-15000000
Employee Number:
100~200
Ecer Certification:
Active Member
It is one of the ten most famous towns in Zhongzhou, which is adjacent to National Highway 107 in the South and Beijing-Guangzhou Railway in the north. The company has the B-class boiler manufacturing license issued by the General Administration of Inspection and Quarantine of th... It is one of the ten most famous towns in Zhongzhou, which is adjacent to National Highway 107 in the South and Beijing-Guangzhou Railway in the north. The company has the B-class boiler manufacturing license issued by the General Administration of Inspection and Quarantine of th...
Get in touch with us
Leave a Message, we will call you back quickly!