Packaging Details | Standard Packing |
Delivery Time | 15-30days |
Payment Terms | T/T,L/C,Western Union,Paypal and MoneyGram |
Temperature Range | 0-300 |
Voltage | 380V |
Power | 5.5-20KW |
Current | 12.6-46A |
Place of Origin | CHINA |
Brand Name | Tongxin |
Certification | IS0 |
View Detail Information
Explore similar products
Portable Vulcanizing Accessories Clean Water Electric Hydraulic Pump
Durable High Pressure Electric Water Pump High Hardness Alloy Layer
Small Size Vulcanizing Accessories 2800r / Min Stable Performance
High Strength Vulcanizing Machine Heating Plate Corrosion Resistant
Product Specification
Packaging Details | Standard Packing | Delivery Time | 15-30days |
Payment Terms | T/T,L/C,Western Union,Paypal and MoneyGram | Temperature Range | 0-300 |
Voltage | 380V | Power | 5.5-20KW |
Current | 12.6-46A | Place of Origin | CHINA |
Brand Name | Tongxin | Certification | IS0 |
High Light | vulcanizing machine accessories ,vulcanizing machine fittings |
TXCK curing machine temperature control box
Water-cooling vulcanizing machine (hereinafter referred to as vulcanizing machine), small in size, light in weight, common three-phase power supply, uniform temperature of hot plate, uniform pressure of water pressure system supply (1.0~2.0mPa), equipped with light automatic electric control box, The connection between the electric control box and the main unit is completed by the integrated plug-in and multi-core cable. It is easy to operate and reliable. It is widely used in metallurgy, mining, power plant ports, building materials, chemical industry and other non-explosive gases and harmful gases that can corrode metals. On-site vulcanization of canvas, nylon, and steel cord transport tapes, and vulcanized joints for special properties such as anti-corrosion and heat resistance. Moreover, as long as the equipment has a common tap water source at the site, the heating plate can be rapidly cooled by water after the vulcanization is completed. It can greatly improve the efficiency and improve the quality of the tape joint. It is generally cooled from the vulcanization temperature to 60 ° C for 20 minutes, and the cooling water source pressure is ≥ 0.2mpa. The quality of the tape joint directly affects the working efficiency of the tape, the effectiveness of use, the service life, especially the current long distance, and the high-strength conveyor belt is more important. Therefore, the DJSL type electric heating tape vulcanizing machine is indispensable in the current tape transportation machinery. Auxiliary equipment. The components of the water-cooling vulcanizer are light and can be moved by hand. The power and water source should be considered before installation. Use a special water pipe to connect the tap water source with the upper and lower heating plate cooling water pipes of the vulcanizer, but do not release water for a while. At this time, start the constant temperature to the end of the vulcanization constant temperature time. At this time, open the tap water and pass the water to the hot plate. When the temperature drops to the process value. When the water is disassembled, the vulcanization operation is completed.
The quality of the tape joint directly affects the working efficiency of the tape, the effectiveness of use, the service life, especially the current long distance, and the high-strength conveyor belt is more important. Therefore, the DJSL type electric heating tape vulcanizing machine is indispensable in the current tape transportation machinery. Auxiliary equipment.
The components of the water-cooling vulcanizer are light and can be moved by hand. The power and water source should be considered before installation. Use a special water pipe to connect the tap water source with the upper and lower heating plate cooling water pipes of the vulcanizer, but do not release water for a while. At this time, start the constant temperature to the end of the vulcanization constant temperature time. At this time, open the tap water and pass the water to the hot plate. When the temperature drops to the process value. When the water is disassembled, the vulcanization operation is completed.
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
5000000-10000000
Employee Number:
65~75
Ecer Certification:
Active Member
Jiangyin Tongxin Vulcanizing Machine Factory (formerly Jiangyin Vulcanizing Machine Factory) is located in the scenic Jiangyin Golden Triangle Development Zone in the north of Wuxi City. It was built in 1984 and has 56 employees and 15 engineers and technicians. 21,000 square meters, fixed assets of... Jiangyin Tongxin Vulcanizing Machine Factory (formerly Jiangyin Vulcanizing Machine Factory) is located in the scenic Jiangyin Golden Triangle Development Zone in the north of Wuxi City. It was built in 1984 and has 56 employees and 15 engineers and technicians. 21,000 square meters, fixed assets of...
Get in touch with us
Leave a Message, we will call you back quickly!