Packaging Details | Standard Packing |
Delivery Time | 15-30days |
Payment Terms | T/T,L/C,Western Union,Paypal and MoneyGram |
Vulcanization temperature | 145 ° C |
Heating plate size | 700 × 350 (mm) |
Vulcanization pressure | 0.5Mpa |
Rated power | 3.6KW |
Brand Name | Tongxin |
Model Number | Non-standard |
Certification | IS0 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Customized Rubber Conveyor Belt Repairer Heat Resistant Long Life Span
High Strength Conveyor Belt Clamping System Durable Conveyor Belt Repair Kit
Professional Conveyor Belt Repair Machine Metallurgy Mining Industry Use
Compact Structure Conveyor Belt Repair Machine Stable Performance
Product Specification
Packaging Details | Standard Packing | Delivery Time | 15-30days |
Payment Terms | T/T,L/C,Western Union,Paypal and MoneyGram | Vulcanization temperature | 145 ° C |
Heating plate size | 700 × 350 (mm) | Vulcanization pressure | 0.5Mpa |
Rated power | 3.6KW | Brand Name | Tongxin |
Model Number | Non-standard | Certification | IS0 |
Place of Origin | CHINA | ||
High Light | conveyor belt repair tools ,conveyor belt maintenance tools |
XBG-2 electric heating tape repairer
use:
During the operation of the belt conveyor, due to the deviation of the conveyor or the quality of the conveyor itself, the two sides of the tape are damaged, which affects the normal use. The repairing machine can not remove the roller in a short time (usually 3 hours) after the shutdown. In this case, effective vulcanization repair is applied to the edge damage.
Technical Parameters:
(1) Vulcanization temperature: 145 ° C
(2) Heating plate size: 700 × 350 (mm)
(3) Vulcanization pressure: 0.5Mpa
(4) Rated power: 3.6KW
XBG-2 type installation:
(1) Fill the damaged parts that need to be repaired (see the filling part in the vulcanization process of the tape joint, or the demonstration by the service personnel of the factory when the equipment is commissioned).
(2) The lower bottom plate, the water pressure plate and the lower heating plate are placed under the damaged portion of the tape according to the structural diagram.
(3) Place a heating plate, a heat insulating plate, an upper bottom plate, and a lower bottom plate on the repaired portion.
(4) Install the lock case at equal distances and tighten the transfer bolts.
(5) Connect the power supply and the electric control box with one wire, and connect the upper heating plate and the electric control box, the lower heating plate and the electric control box with the secondary wires. Note that it corresponds to the electric control box label.
(6) Connect the water pump and the water pressure plate with a high-pressure hose to open the electric control box. (See the XBG electric control box operation method for details), and fill the water pressure plate to the vulcanization pressure.
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
5000000-10000000
Employee Number:
65~75
Ecer Certification:
Active Member
Jiangyin Tongxin Vulcanizing Machine Factory (formerly Jiangyin Vulcanizing Machine Factory) is located in the scenic Jiangyin Golden Triangle Development Zone in the north of Wuxi City. It was built in 1984 and has 56 employees and 15 engineers and technicians. 21,000 square meters, fixed assets of... Jiangyin Tongxin Vulcanizing Machine Factory (formerly Jiangyin Vulcanizing Machine Factory) is located in the scenic Jiangyin Golden Triangle Development Zone in the north of Wuxi City. It was built in 1984 and has 56 employees and 15 engineers and technicians. 21,000 square meters, fixed assets of...
Get in touch with us
Leave a Message, we will call you back quickly!