Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1500 set/sets, per year |
Delivery Time | 20-30 days as usual delivery |
Packaging Details | The towed lifting platform will be packed by the tarp, the parts will be shipped in the high quality wooden case. |
Color | Customized |
Warranty | 24 months |
Load capacity | Customized |
Power supply | Battery Operated |
Port | Qingdao/Tianjin/Shanghai |
Application | shipbuilding,factory,workshop |
Materials | Steel |
Brand Name | BEFANBY |
Model Number | towed lift platform |
Certification | CE,SGS,ISO9001 |
Place of Origin | Henan,China |
View Detail Information
Explore similar products
320kg Automatic Workshop Mobile Scissor Lift Platform
Outdoor Electric Scissor Aerial Lift Work Platform
500kg Self Propelled Hydraulic Scissor Lift Table
Outdoor 10m Full Automatic Hydraulic Ladder Lift
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 1500 set/sets, per year |
Delivery Time | 20-30 days as usual delivery | Packaging Details | The towed lifting platform will be packed by the tarp, the parts will be shipped in the high quality wooden case. |
Color | Customized | Warranty | 24 months |
Load capacity | Customized | Power supply | Battery Operated |
Port | Qingdao/Tianjin/Shanghai | Application | shipbuilding,factory,workshop |
Materials | Steel | Brand Name | BEFANBY |
Model Number | towed lift platform | Certification | CE,SGS,ISO9001 |
Place of Origin | Henan,China | ||
High Light | Hydraulic Towed Scissor Lift Platform ,Cleaning Elevator Lifting Platform ,Electric Scissor Lift Platform |
Scissor lift platform is usually composed of three parts: platform, scissor lifting mechanism and base. The platform is located on the top, which is mainly to bear the load for the staff to carry out various high-altitude operations. Scissor lifting mechanism is the key component of lifting platform, different lifting platform has its own scissor lifting mechanism, from low lifting to high lifting, the number of scissor rod is increased, the arrangement of hydraulic cylinder is also different, the number of arm rod of scissor lifting mechanism and the arrangement of hydraulic cylinder is determined by the lifting height. The base is located at the bottom, on which there are legs, tires, fuel tanks and other components.
Towed lifting platform is easy to move, suitable for all kinds of rugged terrain in the field, a wide range of space operations, mainly used in construction, bridge construction, shipbuilding, airports, mines, ports, communication and power facilities construction and outdoor advertising construction machinery and equipment.
Load Capacity | 500kg |
Capacity-Extension Deck | 110kg |
Max Number of Workers | 4 |
Max Working Height | 8m |
Max Platform Height | 6m |
Extension Deck Size | 0.9m |
Min Ground Clearance(Stowed) | 0.1m |
Min Ground Clearance(Elevated) | 0.015m |
Wheelbase | 1.87m |
Min Turning Radius(Inside) | 0m |
Min Turning Radius(Outside) | 2.4m |
Lifting Motor/Driving Motor | 24v/4.5kw |
Battery | 4×6V/200Ah |
Charger | 24v/30A |
Max Grade Ability | 25% |
Self Weight | 2250kg |
Product Tap: Material Handling Cart , Rail Transfer Cart
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Xinxiang Hundred Percent Electrical And Mechanical Co., Ltd.(BEFANBY) is a professional international material handling equipment company integrating R&D, design, production and sales. It has a modern management team, technical team and production technician team.The company was es... Xinxiang Hundred Percent Electrical And Mechanical Co., Ltd.(BEFANBY) is a professional international material handling equipment company integrating R&D, design, production and sales. It has a modern management team, technical team and production technician team.The company was es...
Get in touch with us
Leave a Message, we will call you back quickly!