Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 50,000 Tons per year |
Delivery Time | According to the order |
Deck | Steel Deck/Timber Deck |
Surface Protection | Alkyd Painted or hot dip galvanized |
advantage | fast delivery;easy to install |
Brand Name | Great Wall |
Model Number | CB200;200;Compact-200 |
Certification | ISO9001, BV,SGS,CCIC,CNAS,FORM E,CO,CE |
Place of Origin | China |
View Detail Information
Explore similar products
The 200-Type panel height to 2.134 Meters Large carrying capacity National first
Multi Span Compact 200 Bridge Main Subassembly High Stiffness Long Fatigue Life
Portable Modular Steel Bridge Quickly Installed Easy Transportation
Customized Anti Skid Steel Bailey Bridge Panel Convenient Installation
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 50,000 Tons per year |
Delivery Time | According to the order | Deck | Steel Deck/Timber Deck |
Surface Protection | Alkyd Painted or hot dip galvanized | advantage | fast delivery;easy to install |
Brand Name | Great Wall | Model Number | CB200;200;Compact-200 |
Certification | ISO9001, BV,SGS,CCIC,CNAS,FORM E,CO,CE | Place of Origin | China |
High Light | bridge construction parts ,army temporary bridge |
Multi-project Multifunctional Berea piece Convenient transportation
We provide customized services
Bailey Bridge Introduction
Bailey bridge is standard bridge equipment,adopted extensively and the most popular in the world,possessing the features of simple structure,convenient transport,speedy erection and easy disassembling.While having the advantage of heavy loading capacity,great stability and long fatigue life being capable of an alternative span,long capacity and mixture form to erect all kinds and usage of temporary bridges,emergency bridges and fixed bridges.The bridge has the advantages of few components,light weight and low cost.
The Bailey bridge is a type of portable, pre-fabricated ,modular truss bridge. It was developed by the British during World War II by Donald Coleman Bailey for military use and saw extensive use by both British and the American military engineering units.During 1980s,it was introduced to China From UK.
We have two producing lines to manufacture Compact-100( 321-Type) and Compact-200(200-type)
The surface disposal is painting,galvanized or anti-skid wearing such as a polyurethane bonded bauxite chip system or similar according to the requirement.
Specifications | ||
Pedestrian way / Single lane | Double lane | |
Width: | 2m/2.5m/3.15m / 4m/4.2m | Standard roadway:7.35M |
Maximum Free Span: | 60.96M | 45.72M |
Deck | Anti-skid Steel/Timber/Concrete/Epoxy Mixture Material | |
Loading Capacity | design according to different requirements,like people walking, 40TONNES,AASHTO HS20,HS25-44,BS5400HA+30HB,Truck-60,Trailler 80,etc. | |
Corrosion Prevention | Original Painted Or Hot Dip Galvanized | |
Bridge Type | 321-Type(100-Type, CB100) & 200-Type(CB200, Compact-200,ZB200,HD200,etc) | |
Advantages | Low Cost;Easy Transportation;Interchangable;Quaickly-installed, repeatly used,etc |
Advantages
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Features
1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.
Application
Beam bridge,arch bridge,rapid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge
Mixture form to erect all kinds of
Temporary Bridges, Emergency Bridges and Fixed Bridges.
Using the bridge equipment, the suspension bridges of varied span can be erected.
The bridge has the advantages of few components, light weight and low cost.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements
are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Compact-200 Bailey Bridge Specification and Typical Configuration
Compact-200 Bailey Bridge
Model Alias: HD200,CB200,ZB200
Single lane: Bridge deck net width: 3.15m. Maximum Free Span length: 60.96m
Extra Width Single lane: Bridge deck net width: 4.2m. Maximum Free Span length: 60.96m
Std. Double lanes: Bridge deck net width: 7.35m. Maximum Free Span length: 45.72m
Panel Dimension:3048MMX2134MM(Holes center distance)
The Compact-200 panel bridge is similar to the Compact-100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. For some bridge with longer spans, It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges. The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 ,HL-93 and pedrail-50 etc.
Span-Load Table Configuration(For Reference Only)
Bailey Bridge From China ;Great Wall Profile.pdf
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2005
Total Annual:
10,000,000-20,000,000
Employee Number:
100~200
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways;... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways;...
Get in touch with us
Leave a Message, we will call you back quickly!