Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"CB200(HD200) Painted 48.768M,QSR single lane,bailey bridge on sale,steel bridge","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/68\/73\/7d0544a1ed63b9640a74185ce0c1-200x200-1\/cb200_28hd200_29_painted_48_768m_2cqsr_single_lane_2cbailey_bridge_on_sale_2csteel_bridge.jpg","attrs":{"Place of Origin":"China","Brand Name":"Great Wall","Certification":"ISO,CE,SGS","Model Number":"GWG-SLGQ-CB200-008"}}
{"title":"Type 200 Bailey bridge,Maxiangdi Hydropower Station Nepal,Bridge length 51.816m","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/01\/39\/af021624f83b10c995ecc5db1354-200x200-1\/type_200_bailey_bridge_2cmaxiangdi_hydropower_station_nepal_2cbridge_length_51_816m_load_50_tons_net_width_4_2m.jpg","attrs":{"Brand Name":"Great Wall","Model Number":"GWG-DLGQ-CB200-006","Certification":"ISO,CE,SGS","Place of Origin":"China"}}
{"title":"ACROW 700XS Bailey Bridge with Large Carrying Capacity\/Bailey Bridge","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/55\/00\/9bfa6f0a951372048b5fffce3d42-200x200-1\/acrow_700xs_bailey_bridge_with_large_carrying_capacity_2fbailey_bridge.jpg","attrs":{"Brand Name":"Great Wall","Model Number":"GWG-DLGQ-CB200-006","Certification":"ISO,CE,SGS","Place of Origin":"China"}}
{"title":"CB200(HD200) Painted 42.672M TSR double lane bailey bridge\/two lanes\/modular","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/6e\/58\/38279499750ddd4012a1cfe6be5d-200x200-1\/cb200_28hd200_29_painted_42_672m_tsr_double_lane_bailey_bridge_2ftwo_lanes_2fmodular_2fsteel_bridge.jpg","attrs":{"Place of Origin":"China","Brand Name":"Great Wall","Certification":"ISO,CE,SGS","Model Number":"GWG-DLGQ-CB200-006"}}
{"title":"CB200(HD200) Galvanized bailey bridge with pedestrian way,bailey bridge,foot","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/d8\/5e\/5815940761f388ff7816dbd96904-200x200-1\/cb200_28hd200_29_galvanized_bailey_bridge_with_pedestrian_way_2cbailey_bridge_2cfoot_walk_2cbridge.jpg","attrs":{"Place of Origin":"China","Brand Name":"Great Wall","Certification":"ISO,CE,SGS","Model Number":"GWG-DLGQ-CB200-006"}}
{"title":"CB200(HD200) Hot dip galvanized TSR double lane bailey bridge,steel bailey","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/8b\/d9\/5c21f22150f235c245812b89efaa-200x200-1\/cb200_28hd200_29_hot_dip_galvanized_tsr_double_lane_bailey_bridge_2csteel_bailey_bridge_2cmabey.jpg","attrs":{"Place of Origin":"China","Brand Name":"Great Wall","Certification":"ISO,CE,SGS","Model Number":"GWG-SLGQ-CB200-006"}}
The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
If you want the Bridge design-Load-Span table,Pls click request a quota.
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...