Corrosion Prevention | Galvanization Or Painting |
Packaging Details | In Bulks Or as per required |
Delivery Time | Depending on the order |
Payment Terms | TT Or LC |
Supply Ability | Sufficient |
Grade | JT-T 728-2008 |
Type | Heavy |
Application | Steel Structure Bridge |
Standard | BS|GB|JIS |
Place of Origin | China |
Brand Name | Great Wall |
Certification | ISO,CE,SGS |
Model Number | GWG-CB100-019&020,GWG-CB200-016&017 |
View Detail Information
Explore similar products
CB200(HD200) Components-Vertical Frame- Connect trusses-Bailey Frames
Sway Brace for CB321/100 &CB/HD200 Bailey Bridges
Chord Reinforcement &Chord Bolts for Bailey Bridge(CB100 and CB200)
Transom CB321(CB100) And Transom Clamp For Bailey Bridges
Product Specification
Corrosion Prevention | Galvanization Or Painting | Packaging Details | In Bulks Or as per required |
Delivery Time | Depending on the order | Payment Terms | TT Or LC |
Supply Ability | Sufficient | Grade | JT-T 728-2008 |
Type | Heavy | Application | Steel Structure Bridge |
Standard | BS|GB|JIS | Place of Origin | China |
Brand Name | Great Wall | Certification | ISO,CE,SGS |
Model Number | GWG-CB100-019&020,GWG-CB200-016&017 |
1,It is erected in the both of bridge, used to move the load to bridge bearing.
2,It can be dedicated into male and female.
End Posts are placed in the two ends of the bridge, used for transmitting the bridge load to the bridge brace. End post comprises male and female. While installing, they are installed to the end respectively. The two holes on the side of the end post shall connect the upper and lower chord member of the truss frame, and the upper oval hole connects the second-floor truss; there are short cantilever and kinetic hasp with locating pin on the under-part of end post for setting and fixing transom. During long distance transport, move the kinetic hasp to the post inside and fasten with bolt. Saddle-shaped pad is welded to the post bottom for its locating on the axial girder.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller,Other
Year Established:
2006
Total Annual:
30% - 40%
Employee Number:
200~500
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...
Get in touch with us
Leave a Message, we will call you back quickly!