Packaging Details | Containers(20GP,40HC) Or In Bulks |
Delivery Time | Depending on the quantity |
Payment Terms | TT, LC |
Supply Ability | 10,000TON average each year |
Corrosion Prevention | Galvanization Or Painting |
Launching method | Cantilever pushing method or Hoisting Lifting If short and light |
Grade | JT-T 728-2008 |
Type | Heavy |
Application | Steel Structure Bridge |
Standard | ASTM|BS|DIN|GB |
Place of Origin | China |
Brand Name | Great Wall |
Model Number | CB200(HD200) And CB100(CB321) |
Certification | ISO,CE,SGS |
View Detail Information
Explore similar products
Modular/ bailey bridge/portable/temporary/military bridge/steel/quick bridge
bailey bridge/portable/temporary/military bridge/steel/quick bridge/pedestrian
Quick bailey bridge,portable,temporary,military bridge,galvanized steel,quick
Bailey bridge /Bailey bridge design and installation
Product Specification
Packaging Details | Containers(20GP,40HC) Or In Bulks | Delivery Time | Depending on the quantity |
Payment Terms | TT, LC | Supply Ability | 10,000TON average each year |
Corrosion Prevention | Galvanization Or Painting | Launching method | Cantilever pushing method or Hoisting Lifting If short and light |
Grade | JT-T 728-2008 | Type | Heavy |
Application | Steel Structure Bridge | Standard | ASTM|BS|DIN|GB |
Place of Origin | China | Brand Name | Great Wall |
Model Number | CB200(HD200) And CB100(CB321) | Certification | ISO,CE,SGS |
High Light | military bridge ,Bailey Panel ,panel bridge |
In order to save clients’cost, if neccessary,panel bridge engineers will simultaneously help clients to train their own erection technician by using erection instruction methods, in order that clients can use them repeatedly.
Introduction of Common erection Methods
Cantilever Pushing Method: Restricted by construction site, giant erecting equipment often cannot enter the site.Simple-equipped cantilever Pushing Method is widely used to erect bridge quickly and safely. It doesn’t need giant erection equipment, and experienced workers can perform the bridge erection task after limited training. The so-called cantilever Pushing Method is to install Rocking Roller and Plain Roller on both sides of a river. Then, majority of bridge components assembled on the roller at the pushing side is pushed by using human power or machine steadily and slowly to the roller on the other side of the river.
Certainly, we will choose the applicable erection methods according to the products and job site circumstance. The methods include flouting erection method, conditioning hoisting method, local assemble method and so on.
Bailey Bridge Advantages
1 Quick Launching and erection
2 No need big machines and skilled labor
3 Low weight to transport
4 Easy transporration
5 Common used and interchangable
6 Widely erected all over the world
7 Economic ,cheap and safe
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller,Other
Year Established:
2006
Total Annual:
30% - 40%
Employee Number:
200~500
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...
Get in touch with us
Leave a Message, we will call you back quickly!