Payment Terms | T/T, L/C |
Supply Ability | 10000TON average each year |
Delivery Time | Depending on the order |
Packaging Details | Containers(20GP,40HC) Or In Bulks |
Brand Name | Great Wall |
Model Number | HD200/CB200/ZB200 |
Certification | ISO,CE,SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ urban
Walkway bridge/temporary sidewalk/temporary sidewalk/ Bailey pedestrian bridge
PUENTE BAILEY/Bailey Bridge/Prefabricated Compact Bailey Bridge / 200-Type panel
Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 10000TON average each year |
Delivery Time | Depending on the order | Packaging Details | Containers(20GP,40HC) Or In Bulks |
Brand Name | Great Wall | Model Number | HD200/CB200/ZB200 |
Certification | ISO,CE,SGS | Place of Origin | China |
The 200-Type panel bridge is similar to the 321-Tycb200pe panel bridge from their appearance. The difference is its increased panel height to 2.134m. For some bridge with longer spans, It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges. The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of thebridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 ,HL-93 and pedrail-50 etc.
Single lane:
Bridge deck net width: 3.15m. Maximum Free Span length: 60.96m
Extra Width Single lane: Bridge deck net width: 4.2m. Maximum Free Span length: 60.96m
Std. Double lanes: Bridge deck net width: 7.35m. Maximum Free Span length: 45.72m
Panel Dimension:3048MMX2134MM(Holes center distance)
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller,Other
Year Established:
2006
Total Annual:
30% - 40%
Employee Number:
200~500
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...
Get in touch with us
Leave a Message, we will call you back quickly!