Payment Terms | TT LC |
Supply Ability | 10,000TON each year |
Delivery Time | Depending on the quantity |
Packaging Details | Containers(20GP,40HC) Or In Bulks |
Grade | JT-T 728-2008 |
Type | Heavy |
Application | Steel Structure Bridge |
Standard | ASTM|BS|DIN|GB |
Brand Name | Great Wall |
Model Number | CB200(HD200) |
Certification | ISO,CE,SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ urban
Walkway bridge/temporary sidewalk/temporary sidewalk/ Bailey pedestrian bridge
PUENTE BAILEY/Bailey Bridge/Prefabricated Compact Bailey Bridge / 200-Type panel
Satisfy AASHTO HS25-44 criterion /Prefabricated Compact Bailey Bridge / 200-Type
Product Specification
Payment Terms | TT LC | Supply Ability | 10,000TON each year |
Delivery Time | Depending on the quantity | Packaging Details | Containers(20GP,40HC) Or In Bulks |
Grade | JT-T 728-2008 | Type | Heavy |
Application | Steel Structure Bridge | Standard | ASTM|BS|DIN|GB |
Brand Name | Great Wall | Model Number | CB200(HD200) |
Certification | ISO,CE,SGS | Place of Origin | China |
Bailey bridge was introduced from UK.and It is standard bridge equipment,adopted extensively and the most popular in the world,possessing the features of simple structure,convenient transport,speedy erection and easy disassembling.While having the advantage of heavy loading capacity,great stability and long fatigue life being capable of an alternative span,long capacity and mixture form to erect all kinds and usage of temporary bridges,emergency bridges and fixed bridges.The bridge has the advantages of few components,light weight and low cost.
Specifications:
Single lane: | Standard roadway: 3.15m / 4.2m Or specially made narrow or wider | Single lane: 30ft-200ft |
Double lane: | Standard roadway:7.35m Or specially made narrow or wider | Double lane:30ft-180ft |
Load: design according to different requirements(Hs20,HS25,BS5400 HA,Truck,Trailer,30TON,40TON,50TON,etc) | Deck: steel deck/timber deck | |
Bridge type: CB100, CB200,Decking,Overhung Type Or other special-made design according to the structrual design | If Bridge is very long,Engineer advises to erect a pier or support to divide the length into several shorter spans |
bailey bridge Competitive Advantage:
Heavy loading capacity
Great stability
Long fatigue life
Light weight
Low cost
Easy and fast erection
The compact 200 panel bridge can also be assembled into double lane bridge,hence it broadens its application range. It is suitable for the load designs of HS-15,HS-20,HS-25,HL-93 and pedrail-50 etc.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller,Other
Year Established:
2006
Total Annual:
30% - 40%
Employee Number:
200~500
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...
Get in touch with us
Leave a Message, we will call you back quickly!