China factories

China factory - Zhenjiang Great Wall Group Co.,Ltd

Zhenjiang Great Wall Group Co.,Ltd

  • China,Zhenjiang ,Jiangsu
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China D-bridge is the patent of Great Wall
China D-bridge is the patent of Great Wall

  1. China D-bridge is the patent of Great Wall
  2. China D-bridge is the patent of Great Wall
  3. China D-bridge is the patent of Great Wall
  4. China D-bridge is the patent of Great Wall

D-bridge is the patent of Great Wall

  1. MOQ: 1 set
  2. Price: Negotiated
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 12000TON each year
Delivery Time Depending on the quantity
Packaging Details In Bulks
Brand Name Great Wall
Certification ISO,SGS,CCIC,BV,CNAS
Place of Origin zhengjiang

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 12000TON each year
Delivery Time Depending on the quantity Packaging Details In Bulks
Brand Name Great Wall Certification ISO,SGS,CCIC,BV,CNAS
Place of Origin zhengjiang

Description:

 

D-bridge is the patent of Great Wall;It was invited from Germany and has advantage in the long-span and big loading comparing to bailey bridge. Thus, it can save cost of piers.

Its panel chord is bigger than bailey bridge panel but the panel structure is simpler. All the components are bolted so the bridge can be used as a permanent bridge because of its small deflection..The components are interchangeable and repetitively used.This kind of bridge has various structure changes to satisfy different loading capacity.
 


The surface protection can be paint or hot-dip galvanized.

 

Specifications:

 

Specifications:  
Single lane Standard roadway: 4.2m Single span: 35m-81m
Double lane Standard roadway:7.35m Single span: 35m-72m
Load: design according to different requirements  
Deck: steel deck / concrete deck

 


Competitive Advantage:

 

  • Heavy loading capacity
  • Used as permanent bridge
  • Great stability
  • Simple in structure
  • Long service life
  • Rapid in erection

 

Introduction

GW D bridge is a standard bridge equipment, adopted extensively and the most popular in the world


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity


Features

1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally prefabricated factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.


Application

Beam bridge,arch bridge,rigid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge


Mixture form to erect all kinds of

Temporary Bridges, Emergency Bridges and Fixed Bridges.
Using the bridge equipment, the suspension bridges of varied span can be erected.
The bridge has the advantages of few components, light weight and low cost.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements
are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.


The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel
bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.
Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company,Seller,Other

  • Year Established:

    2006

  • Total Annual:

    30% - 40%

  • Employee Number:

    200~500

  • Ecer Certification:

    Active Member

ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhenjiang Great Wall Group Co.,Ltd
  • NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China
  • https://baileybridgechina-com.ecer.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement