Payment Terms | L/C, T/T |
Supply Ability | 1000TON each year |
Delivery Time | Depending on the quantity |
Packaging Details | In Bulks |
Brand Name | Great Wall |
Certification | ISO,CE,SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Pontoon Bailey bridge/steel bridge design/bailey bridge
Specialized Production Pontoon Bailey bridge/Reusable Floating Temporary
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 1000TON each year |
Delivery Time | Depending on the quantity | Packaging Details | In Bulks |
Brand Name | Great Wall | Certification | ISO,CE,SGS |
Place of Origin | China |
Name | Bailey pontoon bridge |
Alias | assembled pontoon bridge; assembled highway steel bridge, steel bridge, steel trestle bridge; temporary pavement; temporary bridge; Bailey bridge; |
Model | 321; 200; GW D; |
Commonly used truss plate models | 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc. |
Maximum single span of steel bridge design | about 60 meters |
Standard lane width of steel bridge | single lane 4 meters; double lane 7.35 meters; design according to demand. |
Load Class | Automobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. Tail |
Design scheme | According to the different spans and loads, choose the appropriate arrangement and floating box scheme. |
Main Material of Steel Bridge | GB Q345B |
Connection pin material | 30CrMnTi |
Connection bolt grade | 8.8 grade high strength bolt; 10.9 grade high strength bolt. |
Surface anti-corrosion | hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc. |
Bridge erection methods | hoisting method; floating method, etc. |
Installation time | 30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions) |
Installation requirements | 15-20 workers (determined according to site conditions) |
Installation equipment | crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions) |
Features of steel bridge | No need to be pier, interchangeable, removable, long service life |
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller,Other
Year Established:
2006
Total Annual:
30% - 40%
Employee Number:
200~500
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways; 30 kilometers away ...
Get in touch with us
Leave a Message, we will call you back quickly!