Packaging Details | Packed with plastic films and wrap with strips |
Delivery Time | According to customer's requirement |
Payment Terms | Negotiable |
Supply Ability | Strong production capacity |
EPC | Engineering Procurement Construction |
Press Shop | Consulting |
Body Shop | Main/Closures/Floor/Sub-assembly/Metal finishing |
Paint Shop | PT/ED Line/Primer Top Paint |
Assembly Shop | Trim/Sub-assembly/Testing |
Engineering | Plant Planning, R&D, SE |
Production capacity | Improvement |
Simulation | PDPS |
Overall Planning | General Layout, Analysis Drawings |
After-sale Service | 24/24 7/7 |
Place of Origin | China |
Brand Name | CEI-Kinte |
Certification | ISO9001/FEM/ISO14001/OHSAS 18001 |
Model Number | Customized |
View Detail Information
Explore similar products
Automobile Factory Planning And EPC Engineering Procurement Construction
TRIAL PRODUCTION SERVICE/Automotive EPC
Automatic Stamping Production Line/Automotive EPC
Automobile Body-In-White Robot Welding System Welding
Product Specification
Packaging Details | Packed with plastic films and wrap with strips | Delivery Time | According to customer's requirement |
Payment Terms | Negotiable | Supply Ability | Strong production capacity |
EPC | Engineering Procurement Construction | Press Shop | Consulting |
Body Shop | Main/Closures/Floor/Sub-assembly/Metal finishing | Paint Shop | PT/ED Line/Primer Top Paint |
Assembly Shop | Trim/Sub-assembly/Testing | Engineering | Plant Planning, R&D, SE |
Production capacity | Improvement | Simulation | PDPS |
Overall Planning | General Layout, Analysis Drawings | After-sale Service | 24/24 7/7 |
Place of Origin | China | Brand Name | CEI-Kinte |
Certification | ISO9001/FEM/ISO14001/OHSAS 18001 | Model Number | Customized |
High Light | FEM Automotive EPC ,Automotive EPC FEM ,FEM car manufacturing line |
ASSISTANCE IN DEVELOPING SE
SE Team Overview
Position | Number of employees1-3 years of industrial experience | Number of employees3-5 years of industrial experience | Number of employees5-8 years of industrial experience | Total |
Technical Director | / | / | 5 | 5 |
Step Simulation | 8 | 5 | 3 | 16 |
Mechanical Design | 12 | 6 | 3 | 21 |
Layout | 2 | 2 | 1 | 5 |
Associate Technologies | / | 2 | 1 | 3 |
PD Expert | / | 2 | / | 2 |
Conveyor Expert | / | 1 | 1 | 2 |
Data Management | 2 | / | / | 2 |
List of Special Standards | 1 | 1 | 2 | 4 |
SE Service and Deliverables
SE is divided into four phases: punching SE, welding SE, coating SE and assembling SE. We mainly provide the development assistance service related to welding Simultaneous Engineering, the service contents of which are as follows:
Phase | Item | Description | Deliverables |
Phase-I Engineering Design | Analysis of assembly process | Feasibility Analysis of Welding Process | Analysis Report for Assembly of Welding Parts |
Interference inspection of parts assembly | |||
Feasibility analysis of welding process | Define parts connection mode (steel spot welding, aluminum spot welding, CO2 shielded welding, SPR, FDS, Flexweld, Bolt, etc.) | Report for Feasibility Analysis of Welding Process | |
Analysis and determination of the quantity, size and surface quality of welding spots | |||
Analysis of welding overlap | |||
Define gluing method and area | |||
Weldability Analysis | Analyze and optimize the methods of welding between parts (manual welding, automatic welding, robot welding or laser welding, etc.) | Weldability Analysis Report | |
Feasibility analysis of projection welding nut, stud and spot welding | |||
Analysis on the number of welding spots and the human-machine operability of welding parts | |||
Phase-II Engineering Design | Partitioning of car body structure | Establish assembly strategy | Family Tree |
Analysis of partitioned sub-assembly structure | |||
Analysis of Positioning and Clamping Points | Analysis of locating hole | PLP document | |
Analysis of locating surface | |||
Definition and analysis of support clamping surface | |||
Welding Process Planning | Analysis on the loading sequence of parts | Process Planning Scheme | |
Analyze and optimize the operation content and realization form of each station | |||
Process design (work sequence, welding content, welding position, welding quantity, standard working time, equipment and fixture) | |||
Layout plan and workshop logistics design (define and optimize workshop station layout, process flow and logistics) | Layout | ||
Analysis of operation man-hour (analyze the cycle time and balance of each station, define the number of workers at each station and adjust the work content of each station) | Cycle Time | ||
Phase-III Engineering Design | Simulation | Selection & simulation of robot, welding gun and other process equipment | Simulation |
Simulation of joining process accessibility | |||
Logistics simulation | Simulation and verification of the cycle time and output of production line | Plant Simulation | |
verification of the buffer quantity between and within production lines | |||
3D design | 3D structure design | 3D | |
Design of conveying (between lines, within lines, equipment switching, etc.) | |||
Multi-vehicle flexible switching assembly structure |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1958
Total Annual:
300000000-500000000
Employee Number:
2500~2800
Ecer Certification:
Verified Supplier
KINTE provides systematic solutions for the intelligent logistics system by scientific research & development and technological standard innovation, forming three main business sectors of Quality and Technical Services, Intelligent Equipment, Environmental Protection Coatings and Resin. Serv... KINTE provides systematic solutions for the intelligent logistics system by scientific research & development and technological standard innovation, forming three main business sectors of Quality and Technical Services, Intelligent Equipment, Environmental Protection Coatings and Resin. Serv...
Get in touch with us
Leave a Message, we will call you back quickly!