Payment Terms | L/C, T/T, MoneyGram |
Supply Ability | 200000 Sqm Per Week |
Delivery Time | 10 - 15 Days |
Packaging Details | Packed In Rolls With Cover |
Item | Football Grass |
Application | Football |
Colour | Field green + olive green + tender green (same hole) |
Code | Diamond Trio 180 |
Height | 50mm |
Roll width | 4.0m/2.0m |
Features | The grass surface is plump, wear-resistant, and has good stiffness |
Detex | 18000 |
Stitches per m2 | 6825±100 |
Backing | PP+Leno |
Brand Name | AVG |
Model Number | Diamond Trio 180 |
Certification | SGS , CE , LISPORTS , LABOSPORTS |
Place of Origin | China |
View Detail Information
Explore similar products
PP Leno Backing Soccer Synthetic Grass Monofilament Structure
FIFA Quality 60mm Artificial Turf Grass Uv Resistance For Football Court
Cesped Artificial Football Grass Artificial Grass For Football Soccer Grass
Lawn Carpet Football Artificial Turf 40mm Height 13000Detex
Product Specification
Payment Terms | L/C, T/T, MoneyGram | Supply Ability | 200000 Sqm Per Week |
Delivery Time | 10 - 15 Days | Packaging Details | Packed In Rolls With Cover |
Item | Football Grass | Application | Football |
Colour | Field green + olive green + tender green (same hole) | Code | Diamond Trio 180 |
Height | 50mm | Roll width | 4.0m/2.0m |
Features | The grass surface is plump, wear-resistant, and has good stiffness | Detex | 18000 |
Stitches per m2 | 6825±100 | Backing | PP+Leno |
Brand Name | AVG | Model Number | Diamond Trio 180 |
Certification | SGS , CE , LISPORTS , LABOSPORTS | Place of Origin | China |
High Light | 18000 Dtex Football Artificial Turf Grass ,Soccer Field Fake Grass 60mm ,3/4inch Gauge Soccer Synthetic Turf |
PRO 60mm Soccer Football Artificial Turf Grass Futsal Gazon Synthetique Price For Wholesale
How to install the artificial grass:
1.1. Inspection:
Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes,making sure the foundation is qualified for installing artificial turf;
1.2. Measuring:
Locate the centers of the ground and the two semicircles, and according to these three centers locate the intersecting point of half-way lines and touchlines, and then determine the positions of functional lines and spot by using Pythagorean proposition;
2. Turf layout:
According to drawing, position the turf rolls on the exact places along the touchline.The turf with white lines should be placed at the half-way lines and base line, and then lay out the rolls in order;
3. Preparing functional line:
Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines, base lines etc.), and put them aside preparing for Green Artificial Grass Carpet installation;
4. Seaming:
The adiacent turf rolls must be join together with 20~30mm excess on both sides, then cut the excess part with a special cutting knife on the joint center and trim the cut to make the turf join perfectly together. After trimming, place the seam tape on the foundation surface and make the joint line of turf right on the middle of the seam tape. And then apply the adhesive to seam tape evenly with a rubber spreader, and press down the turf on both sides of the seam tape firmly;
5.1. Installing functional lines:
Measure and re-position the functional line on the turf that has been all well joined on the ground. Cut the turf out and place the seam tape beneath the cuts, then spread the adhesive on the seam tape and install the well-prepared functional lines, press it firmly to ensure the immobility.
5.2. Trimming:
Inspect the finished lawn, if any uneven found, cut it open, pull it straight and cut the excess away.And rejoin it with adhesive;
6. Infilling sand:
Place the sand piles on the finished lawn on different spots evenly at a distance of 4m from each other,then spread them evenly on the lawn(the quantity if sand depends on the pile height of the turf).
Afterwards, use the combing machine to sweep the sand into the fibers and to comb uo the fibers. Do this process once longitudinally and transversely.
7. Infill rubber granules:
After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb up the fibers. Do this process once longitudinally and transversely.
8. Combing:
Once the infilling is finished, comb the turf once more with the combing machie to make the fibers point up to the sky.
9. Inspection:
Inspect the entire finished lawn as per concerned standards and requirement.If any defects found,correct it.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1982
Total Annual:
20 million-25 million
Employee Number:
200~300
Ecer Certification:
Site Member
AVG, built since 1982 and located in Guangzhou, is one of the first professional artificial grass manufacturers in China and becomes FIFA licensee in 2018. After years developing, there are two production plants covering 70,000 square meter with capacity more than 30 million square feet, and 3 R&... AVG, built since 1982 and located in Guangzhou, is one of the first professional artificial grass manufacturers in China and becomes FIFA licensee in 2018. After years developing, there are two production plants covering 70,000 square meter with capacity more than 30 million square feet, and 3 R&...
Get in touch with us
Leave a Message, we will call you back quickly!