Payment Terms | T/T, L/C |
Supply Ability | 100pcs/day |
Delivery Time | 20-25 days |
Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless steel 304/Brass/Copper |
Keywords | Threaded Tube |
Quality control certificate | GJB9001C-2017 |
Tolerance | ±0.05mm |
Color | as per requirements |
manufacturing time | 25 days |
Length | 80 mm |
Brand Name | Zhufu |
Model Number | 15344 |
Certification | ISO9001, CFA,, CASC |
Place of Origin | CHINA-GUANGDONG |
View Detail Information
Explore similar products
Dia. 18mm M10x1 Thread Stainless Steel Pipe Connectors High Standard
D25.5mm L91.5mm Metal Machining Parts Shower Shells Die Casting
SUS316L Ra0.8 Metal Machining Parts Clamping Sleeve High Standard
15.5mm Length M4 Stainless Steel Button , Stainless Button Head Screws
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 100pcs/day |
Delivery Time | 20-25 days | Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless steel 304/Brass/Copper | Keywords | Threaded Tube |
Quality control certificate | GJB9001C-2017 | Tolerance | ±0.05mm |
Color | as per requirements | manufacturing time | 25 days |
Length | 80 mm | Brand Name | Zhufu |
Model Number | 15344 | Certification | ISO9001, CFA,, CASC |
Place of Origin | CHINA-GUANGDONG | ||
High Light | 25mm Metal Machining Parts ,80mm Metal Machining Parts ,80mm threaded copper pipe |
Stainless steel 304/Brass/Copper Threaded Tube 15344 Metal machining parts used for tap Customization
FOSHAN ZHUFU MOULD HARDWARE CO.,LTD. is one of the professional manufacturers which specialize in the CNC machining, casting etc...
Parameters:
product name | Threaded tube |
application | kitchen tap |
diameter | D50/D28 |
tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
raw material | Stainless steel tube |
surface | no burs |
length | 80mm |
thread | M30x1.25 |
length of thread | 68mm |
thread checking | go gauge |
chamfering | C0.5 |
Order procedure:
1. receiving drawing
2. confirm details and make improvements
3. sample order (sample is free of charge, freight collected)
4. making samples
5. sample for confirmation and delivery
6. purchase order for mass production
7. deposit for order
8. mass production
9. shipment
Our advantage service:
1. For any customers who send us the samples of some products, we can design and develop better ones based on the samples.
2. We can do sample according to any customers’ design.
3. we are manufacturer, factory, and we have the ability for mass production.
Technical support:
Most of our machine are all equipped with advanced system, all our workers are experienced and skilled.
After sale service:
Our working team and sales team can guarantee a fast and high efficiency after-sale service for our product sold to everywhere in worldwide.
ZHUFU has a complete supply system for machining parts, which can guarantee the company's demand of product accessories.
We have stocked the common parts in the major cooperation, which can shorten the lead time.
So, if customers have any question, just contact us anytime at your convenience.
Transportation service:
We could check the freight by express/by air/by sea for your checking if you need, you can choose the one which is the most convenient or cost effective for you. Please inform us the terms of delivery when you confirm the order.
Factory Strength
1. Strong and Advanced Equipment
2. 20 Years of Casting Experience to Provide One-Stop Service
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors
Packaging & Delivery:
Packaging Details: Neutral packing or as per customer's requirements. Inner box, outer carton and pallet
Port: Foshan Shunde,China
Lead time:
Qty | 1-1000 | 1001-10000 | >10000 |
Estimated time(days) | 10 | 20 | To be negotiated
|
FAQ:
1. How can I get the price?
-We usually quote within 24 hours after we get your inquiry (Except weekend and holidays).
-If you are very urgent to get the price, please email us or contact us in other ways so that we can offer you a quote.
2. Can I buy samples placing orders?
-Yes. Please feel free to contact us.
3. What is your lead time?
-It depends on the order quantity and the season you place the order.
-Usually we can ship within 7-15 days for small quantity, and about 30 days for large quantity.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2009
Total Annual:
5000000-8000000
Employee Number:
100~150
Ecer Certification:
Active Member
Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari... Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari...
Get in touch with us
Leave a Message, we will call you back quickly!