Payment Terms | T/T, L/C |
Supply Ability | 100pcs/day |
Delivery Time | 10-30 days |
Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless Steel 303 |
other name | Connector |
Tolerance | ±0.05mm |
Color | as drawing |
sample lead time | Common products 1-10 days after received drawing and payment |
delivery time | 10-30 days after order with prepayment based on products structure and quantity |
Brand Name | OEM |
Model Number | 4075b |
Certification | ISO9001, CFA,, CASC |
Place of Origin | CHINA-GUANGDONG |
View Detail Information
Explore similar products
D25.5mm L91.5mm Metal Machining Parts Shower Shells Die Casting
25mm Diameter 80mm Length Metal Machining Parts Threaded Copper Pipe
SUS316L Ra0.8 Metal Machining Parts Clamping Sleeve High Standard
15.5mm Length M4 Stainless Steel Button , Stainless Button Head Screws
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 100pcs/day |
Delivery Time | 10-30 days | Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless Steel 303 | other name | Connector |
Tolerance | ±0.05mm | Color | as drawing |
sample lead time | Common products 1-10 days after received drawing and payment | delivery time | 10-30 days after order with prepayment based on products structure and quantity |
Brand Name | OEM | Model Number | 4075b |
Certification | ISO9001, CFA,, CASC | Place of Origin | CHINA-GUANGDONG |
High Light | M10x1 Stainless Steel Pipe Connectors ,18mm Stainless Steel Pipe Connectors ,18mm Stainless Steel Flex Connectors |
Stainless Steel Connector 4075b Dia. 18mm Metal machining parts 0.05 mm tolerance
Description:
Ra 1.6 metal machining parts, thread M10x1 guarantee go gauge.
Parameters:
product name | Connector |
application | kitchen tap |
diameter | D18 mm |
tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
raw material | die casting |
surface | no burs |
length | 15mm |
chamfering | C0.75/C0.5 |
thread | M10x1 |
thread checking | go gauge |
Steps for order:
1. providing drawing or any specifications, offer quotations.
2. finalize all details and make some improvements.
3. receiving sample order (maximum 5pcs samples are free of charge, freight collected)
4. making samples according to drawing
5. samples for confirmation and delivery
6. purchase order for mass production
7. deposit for orders and confirm delivery date
8. mass production and checking and packing
9. shipment
10. any other questions can consult with our operator.
Our advantage service:
1. For any customers who send us the samples of some products, we can design and develop better ones based on the samples.
2. We can do sample according to any customers’ design.
3. we are manufacturer, factory, and we have the ability for mass production.
Technical support:
Most of our machine are all equipped with advanced system, all our workers are experienced and skilled.
After sale service:
Our working team and sales team can guarantee a fast and high efficiency after-sale service for our product sold to everywhere in worldwide.
ZHUFU has a complete supply system for machining parts, which can guarantee the company's demand of product accessories.
We have stocked the common parts in the major cooperation, which can shorten the lead time.
So, if customers have any question, just contact us anytime at your convenience.
Transportation service:
We could check the freight by express/by air/by sea for your checking if you need, you can choose the one which is the most convenient or cost effective for you. Please inform us the terms of delivery when you confirm the order.
Factory Strength
1. Strong and Advanced Equipment
2. 20 Years of Casting Experience to Provide One-Stop Service
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors
Q&A
Q1: What about the lead time for mass production?
A1: Honestly, it depends on the order quantity and your specific requirements of products.
Q2: What is your terms of delivery?
A2: a: For the weight is under 100kg,we suggest shipment by FedEx, DHL or UPS; this is the fastest and most expensive.
b: For the weight is between 100-200kg,we suggest shipment by air; this is fast and expensive
c: For the weight is above 200kg,we suggest shipment by sea; this is the slowest and the cheapest
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2009
Total Annual:
5000000-8000000
Employee Number:
100~150
Ecer Certification:
Active Member
Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari... Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari...
Get in touch with us
Leave a Message, we will call you back quickly!