Packaging Details | Ply wood Frame Or Customized |
Delivery Time | MOQ 10 Days, 1000pcs 4 Weeks. |
Payment Terms | TT, L/C |
Supply Ability | 3,000 PCS Per Month |
Place of Origin | Guangdong, Mainland China |
Brand Name | LF |
Certification | ISO9001:2008 |
Model Number | LF-SQ1109 |
View Detail Information
Explore similar products
A3 Q235 Metal Stamping Parts Customized SUS 304 Base For Roller Skate Bottom
Metal Stamping Process Mixed Olives Precision Assembly Power Box
Custom Metal Stamping Parts Silver Anodize Aluminum Driver Box With Polishing
High Quality Circle Clip Stamping Parts Stainless Steel Lock Retaining Rings For
Product Specification
Packaging Details | Ply wood Frame Or Customized | Delivery Time | MOQ 10 Days, 1000pcs 4 Weeks. |
Payment Terms | TT, L/C | Supply Ability | 3,000 PCS Per Month |
Place of Origin | Guangdong, Mainland China | Brand Name | LF |
Certification | ISO9001:2008 | Model Number | LF-SQ1109 |
High Light | precision metal stamping ,custom made metal stamps |
Powder Coated Metal Stamping Parts of Side Board For Metal Cabinet
Description:
Large Image: Cabinet Side Board
Application:
For Metal Cabinet
Specification:
Overall Dimension | L1100*W650*H1.5mm |
Board Wall Thickness | 2.0 mm |
Cabinet Net Weight | 4.5 kgs |
Material:
SPCC (JIS Standard), Cold Rolled Sheet, Cold Rolled Strips.
Board Regular Dimension: L2440*W1250*Thickness 0.5-3mm.
Hardness: SPCC-1, SPCC-2, SPCC-4, SPCC-8, SPCC-S
HRB & HV 1/8 Stereoplasm 8 50~71 95~130 1/4 Stereoplasm 4 65~80 115~150 1/2 Rigidity 2 74~89 135~185 Stereoplasm 1 ≥85 ≥170 Annealing S 85~110 Chemical Composition C Si Mn P S ≤0.10 ≤0.05 ≤0.50 ≤0.035 ≤0.025
Surface Powder Coating, With Salt Spray Test Over 96 Hours.
Processing Technic:
1. Cutting
2. Computer Stamping to Forming
3. Bending
4. 2nd Machining, Make Screw Holes If Possible.
5. Assembly: Screwing Tight or Rivet Mount Tight;
6. Polishing to Remove Shape Edges
7. Powder Coating
8. Quality Check
9. Packing
Facility:
Automatic Stamping Machine
Bending Machine
Advantages:
1. Professional Research and Design Team, Necessary Equipments: Automatic Cutting Machine, Laser Cutting Machine, Automatic Press, Cold Press, Bending Machine
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2001
Total Annual:
25,000,000-30,000,000
Employee Number:
450~500
Ecer Certification:
Verified Supplier
Lifong was set up in the year 2011, locates in Dongguan City, Guangdong Province. We provide customers Thermal Solution, Heat Sinks, Other Fabrication Service Like Metal Product Design, tooling making, CNC Machining Process, Casting, Stamping, Sheet Metal Forming, Aluminum Profile extruding, Co... Lifong was set up in the year 2011, locates in Dongguan City, Guangdong Province. We provide customers Thermal Solution, Heat Sinks, Other Fabrication Service Like Metal Product Design, tooling making, CNC Machining Process, Casting, Stamping, Sheet Metal Forming, Aluminum Profile extruding, Co...
Get in touch with us
Leave a Message, we will call you back quickly!