Payment Terms | L/C, T/T |
Supply Ability | 120SETS/YEAR |
Delivery Time | 3MONTHS |
Packaging Details | SUIT FOR SHIPPING |
Name | Boiler |
Rated voltage | 380V |
Certificate | ISO9001/CE |
Packing type | Suit for shipping |
After-sales service provide | Engineers available to service machinery overseas, Field maintenance and repair service, Field installation, commissioning and training, Online support |
Brand Name | SANKON |
Model Number | CUSTOMIZED |
Certification | ISO9001/CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
H3650MM Horizontal Packing Machine
Multi-Function Block Machine/Machine Concrete Block
ISO AAC Rebar Straightening And Cutting Machine
SANKON Hydro Dipping Tank For Wall Panel Machine
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 120SETS/YEAR |
Delivery Time | 3MONTHS | Packaging Details | SUIT FOR SHIPPING |
Name | Boiler | Rated voltage | 380V |
Certificate | ISO9001/CE | Packing type | Suit for shipping |
After-sales service provide | Engineers available to service machinery overseas, Field maintenance and repair service, Field installation, commissioning and training, Online support | Brand Name | SANKON |
Model Number | CUSTOMIZED | Certification | ISO9001/CE |
Place of Origin | CHINA | ||
High Light | Fixture Clamper Chain Grate Boiler ,30 Ton/H Chain Grate Boiler |
ISO Certified AAC Brick Machine with Fixture Clamper-Boiler
Overviews:
Our company boiler is a double-drum water tube assembly chain grate boiler . The boiler proper has an upper drum and a bottom drum longitudinally arranged along the boiler center. The front of the upper drum and two sides water wall tubes constitute the boiler hearth radiation heating surface, and the tubes between the rear of the upper drum and the bottom drum constitute the convection heating surface. The economizer is arranged on the rear of the boiler,part of heat from high temperature exhaust gas generated by burning was absorbed by economizer, then the exhaust gas go through the cooling chamber,exhaust gas enters the convection heating surface to transfer heat power again, and through economizer,dust collector, finally draught by ID fan to Chimney,discharges into the atmosphere.
1.Capacity:2 ton/h to 30 ton/h
2.Design pressure:1.0Mpa(10bar/10kg/145psi), 1.25Mpa(13bar/13kg/180psi), 1.6Mpa(16bar/16kg/232psi),2.5Mpa(25bar/25kg/362psi), other pressure need to be specially design.
3. Stem temperature:184ºC,194ºC,205ºC,226ºC,other temperature need to be specially design.
4. Design fuel:coal,biomass or other solid fuel.
Product parameter:
Boiler model | Rated capacity | Rated pressure
| Rated steam temp.
| Feed water temp. | Exhaust gas temp. | Design effiency | Boiler water volume | Weight | Dimension | Delivery mode |
ton/h | Mpa | ºC | m2 | ºC | % | m3 | ton | mm | ||
SANKON2 | 2 | 1.25/1.6/ 2.5/3.82 | 194/204/ 226/450 | 20/105 | 130.67 | 83.13 | 6.76 | 22 | 5900×2850×3460 | Package |
SANKON4 | 4 | 142 | 84.23 | 5.1 | 29 | 6460×3280×3462 | Package | |||
SANKON6 | 6 | 142 | 84.81 | 8.4 | 34 | 7830×3560×3462 | Package | |||
SANKON8 | 8 | 149.15 | 85.02 | 9.4 | 40.5 | 8870×3670×3462 | Package | |||
SANKON10 | 10 | 152.7 | 86.2 | 8.35 | 24 | 7645×3180×3526 | Assembly | |||
SANKON12 | 12 | 148.7 | 86.56 | 12.8 | 37 | 9258×3294×3524 | Assembly | |||
SANKON15 | 15 | 149.86 | 86.29 | 15.5 | 24.7 | 11010×3300×2200 | Assembly | |||
SANKON20 | 20 | 147.4 | 86.8 | 15.8 | 25.97 | 16680×6200×8420 | Assembly | |||
SANKON25 | 25 | 149.6 | 86.4 | 16.5 | 28 | 8300×3000×3600 | Semi-Assembly | |||
SANKON30 | 30 | 148.6 | 86.8 | 16.8 | 29 | 8500×3600×3640 | Semi-Assembly | |||
Notice: 1.special proposal is available according to different place's different encironmental requirements; 2. burning fuel's heat value/chemincal component different, parameter different; 3.Since the boiler technology is keep updating, if there is any update in the future, no special imform. |
Core technology:
1. Longitudinally arranged double drum
2. Airtight and uniform-pressure wind room
3. Customized combustion device
4. "α" type flame combustion
5. High quality aluminum silicate insulation
6. Built-in dust cleaning
7. Easy operation control system
Boiler accessories:
Packing and shipping
1. Boiler delivery will by two parts.
2.Upper part is for boiler proper pressure part .
3.Bottom part is for boiler Grate.
4.Boiler furnace will be built when boiler arrive client.
5.Wood box packing for boiler accessories and nude packing for boiler main part.
6.We will use frame container for shipping.
Our service
Pre-sales service:
1.Provide the most suitable and cost-effective boiler solution according to different requirements of various industry.
2.Provide drawings for building your boiler roon,such as foundation drawing, layout drawing, boiler room layout, etc.
In-sales service:
24 hours online and keep close contacts during the production process to ensure on time delivery with perfect finished product. We send pictures and videos to let customers know the production schedule.
After-sales service:
1.Provide engineers abroad installation and commissioning service.
2.Held online or site training for boiler workers to ensure the safe operation.
3.Lifelong service.
Company Details
Business Type:
Manufacturer
Year Established:
2007
Total Annual:
100million-200 million
Employee Number:
100~200
Ecer Certification:
Active Member
Formerly known as Wuxi SANKON Automation Equipment Co., Ltd., Jiangsu SANKON Building Materials Technology Co. is an enterprise specializing in the research and development and production of a complete range of autoclaved aerated concrete (AAC) machines and AAC production lines. Since 2007, we have ... Formerly known as Wuxi SANKON Automation Equipment Co., Ltd., Jiangsu SANKON Building Materials Technology Co. is an enterprise specializing in the research and development and production of a complete range of autoclaved aerated concrete (AAC) machines and AAC production lines. Since 2007, we have ...
Get in touch with us
Leave a Message, we will call you back quickly!